In this photo the left side of the trailer, with applied interior plywood, is on the table, inside down, and the right side structure is on top of that.  We took this approach to assure that the details were properly aligned with each other before attaching the inner plywood to the right side.



Once the alignments were correct, we attached the inner plywood to the right side (not shown.)

Both sides are now clad with the inside plywood.  Once we attach the sides and galley structure to the base, install the inner ribs and install the 1/8" birch plywood to the inside of the curve, we can proceed to install all the wiring.

With some edits, we're up to about step 15 in a post below.  We changed the sequence somewhat and the interior ribs have not yet been attached.
 