2012/08/26

Progress Today

Today we pushed forward on the electrical design and cavity configuration, and began construction of the cavity doors.  The upper doors will fold down 90 degrees or so, and will contain the AC panel, the DC panel and the DC meters panel.  They will also hold the Xantrex control and the (forthcoming) Kenwood auto audio system.  The lower doors will drop into place and contain whatever items will fit into the space.


No comments: