Today the first coat of polyurethane was applied to the electrical cavity doors and to the cavity itself. It was the first time in the project that urethane met oak, and it was quite rewarding.
We wanted to get at least a sealer coat on the inside of the cavity before any equipment installations were done, and on the doors (where we will want actual finish coats) before the installed panels are fitted.
Weather (plenty of rain) and intestinal distress have slowed other progress. Please stay tuned.
No comments:
Post a Comment