Yesterday we added the second piece of the first layer of the teardrop front/top. We are only managing one piece per day because of the time required to properly fit each piece, mark the nailing areas and nailing exclusions (where wires are present), then glue, install and staple. On both of the first two pieces we've been working out technique as well; each is different.
The second layer should be easier, but we'll see. Meanwhile, here's a shot with the first two pieces of the first layer installed.
What is not seen here is that the second piece stops short of the hatch by a couple feet. A third, short piece will be required for both layers.
No comments:
Post a Comment
Your comments are welcome, and will be moderated.