The end of August has arrived, and originally I thought we'd be much farther along. Alas, we are not, but then again, we are as far as events would permit.
Today the two top doors for the electrical cavity were hinged and mounted, and the parts to mount to the front profile (and thereby provide vertical mounting for electrical components at the front of the cavity) were created. The conflict noted yesterday was resolved in that the entire drilled hole created for the hinges exists within the oak frame and no possible penetration of the exposed face of the 1/2" oak plywood is possible.
Next steps: mount the door drop limiters (that prevent the doors from dropping beyond 90 degrees) and install the front profile spacers and rails to which the equipment will mount.
Visuals will be presented as they are appropriate.
No comments:
Post a Comment
Your comments are welcome, and will be moderated.